广义参数下最小化总加权完工时间的单机双代理可拒绝排序
邓兵, 张新功
Two-agent scheduling problems with generalized parameters to minimize the weighted sum of completion time plus reject cost on a single machine
Deng Bing, Zhang Xingong
系统科学与数学
.
2024, (): 0
.
DOI: 10.12341/jssms240017